Back to Blog
Cash, Financing & Exit

MOQ: What a Minimum Order Quantity Costs in Cash

MOQ means minimum order quantity. Here is one factory quote priced in cash, the sales pace where a bigger minimum pays, and the ways to bring a minimum down.

Oz Merchant14 min read

A brand owner and a factory supervisor look up at a wall of stacked export cartons that fills most of a factory hall.

A factory quoting $5.40 a tumbler at 10,000 units, against $6.00 at 3,000, saves about $7,200 on one color if every unit sells at full price, and asks for about $46,000 more cash before the first one does.

MOQ, short for minimum order quantity, is the smallest order a supplier will accept, usually stated in units per style or per color and sometimes in dollars per order. A minimum is a cash decision: count the extra units in months of sales before you count the cents off the price. At the pace the tumbler sells, the bigger order comes out about $1,400 ahead over a year. At about 640 units a month it breaks even, and below that the cheaper unit price loses money.

What is MOQ, and why do factories set one?

An MOQ is a supplier's floor: below it, the supplier either declines the order or charges more per unit. Factories set one because each run carries fixed costs (changing over a line, matching a color, setting up print plates or molds) and because their own material suppliers sell in minimum lots that have to be used up.

A box printer charges for plates whether it prints 500 boxes or 5,000, and a mill dyes fabric in lots, which is where most of a clothing factory's minimum comes from, as the guide to negotiating with suppliers traces from yarn to finished shirt. Spread over a small order, those fixed costs push the unit price up. Order-size formulas assume you can buy any quantity; the minimum is the factory telling you that you cannot.

The forms a minimum takes

A single quote can carry several minimums at once, and the binding one is not always the one in the headline.

  • Per order, in units. "MOQ 3,000" with no further detail usually means per order, but ask whether it applies per style or per color.
  • Per order, by value. Some suppliers set a dollar floor per purchase order instead, which several small styles can combine to reach.
  • Per style or product. Each product has its own minimum, because each needs its own setup.
  • Per color. Each color is its own dye lot, powder batch or print run, so four colors at 3,000 each is a 12,000-unit order.
  • Per material or component. A custom-printed box, a branded lid, a woven label or a specific fabric each has a minimum from the company that makes it, and the finished-goods factory passes it on.

Minimums can also creep upward from one reorder to the next, so the minimum on the first quote is not always the minimum on the third (see the FAQ below).

Why a minimum order quantity is a cash decision

The quote shows the unit price, not what the order does to the bank balance or how long the units will sit. Four numbers answer that, set against one: the unit saving.

  1. The extra cash out before the first unit sells: deposit, balance, duty and freight on the extra units.
  2. The months of sales the extra units represent, at the pace the product sells today.
  3. The carrying cost of holding those units for those months: the cost of the money, storage, insurance and shrink.
  4. The write-down risk: what the units left at the end would fetch if the product slows or is replaced.

The unit saving times the units ordered is the most the bigger order can gain, and only if every unit sells at full price.

A worked example: 3,000 tumblers or 10,000

The two quotes below are an example, from a drinkware brand selling about $2.5 million a year; the brand, the duty, the freight, the carrying cost and the sales pace are all invented, so put your own figures in their place. Its best color of a 20-ounce insulated tumbler sells about 800 units a month: $34 in its own store, $17 to wholesale accounts. Both quotes are on 30/70 terms: 30% deposit with the purchase order, and the 70% balance due before loading or against the bill of lading after it, depending on the factory (ask which).

Line per unitQuote AQuote B
Minimum per color3,00010,000
Factory price (FOB)$6.00$5.40
Duty, assumed at 20% of the factory price$1.20$1.08
Freight to the 3PL, assumed$0.45$0.45
Landed cost per unit$7.65$6.93
Order at landed cost$22,950$69,300

The real duty rate depends on the product's classification and country of origin; check it with a customs broker. Duty is generally charged at the rate in force when the goods enter the country, not when you ordered them, so a year of stock bought at once carries a year of tariff risk that a three-month order does not. Freight is held equal per unit; in practice a 3,000-unit shipment often costs more per unit to move, which would favor quote B.

Landed cost (the factory price plus freight and duty) is what the units are carried at in the accounts; the full list is in what landed cost is.

The extra cash and the months it buys

Quote B takes $69,300 out before the first sale against $22,950 for quote A, about $46,000 more. For a company holding about $150,000 in the bank with other orders open, that is close to a third of the balance in one color of one product.

At 800 units a month, quote A is 3.75 months of sales and quote B is 12.5. The extra 7,000 units are almost nine months of sales.

The carrying cost against the saving

The saving is $0.72 a unit landed, $7,200 across 10,000 units. Against it sits the cost of holding more stock for longer. This example uses a carrying cost of 24% a year, or 2% a month: about half is the cost of the money (the rate on a credit line, or what the cash would earn elsewhere in the business) and the rest is storage, insurance and shrink. The method behind the rate is in inventory carrying cost.

With steady sales, stock falls from a full order to zero, so the average on hand is about half an order:

Quote AQuote B
Average units on hand1,5005,000
Average stock at landed cost$11,475$34,650
Difference$23,175
Extra carrying cost at 2% a month$463.50 a month

Quote A assumes the company places a new 3,000-unit order each time the last one is about to run out. Any stock kept in reserve would sit in both options, so it drops out of the comparison.

Quote B's extra carrying cost runs for as long as it takes to sell all 10,000, and that depends on the pace:

Units sold a monthMonths to sell 10,000Unit savingExtra carrying costQuote B ahead by
1,00010$7,200$4,635$2,565
80012.5$7,200$5,794$1,406
64015.6$7,200$7,242about even
50020$7,200$9,270−$2,070

At today's pace, quote B comes out about $1,400 ahead after paying for the money it ties up. That is a thin margin on $46,000 of extra cash, and it rests on a sales forecast for the next twelve months. Below about 640 a month, quote A costs less even before anything goes wrong. This is an economic comparison: most of the cost of money never appears on the P&L, which shows the full $0.72 lower cost of goods as units sell, plus any interest and storage actually paid.

The write-down risk if sales slow

The table assumes every unit sells at full price. If the pace drops to 500 a month, quote B still has 4,000 units after a year. Suppose by then the color has been replaced in the range and the remaining units net $4.00 each after selling costs, against a cost of $6.93. That is a write-down of about $11,700, booked in the month that becomes clear (inventory as an asset covers the rule; the entries are in inventory write-offs).

Under quote A the company would have seen the slowdown and stopped ordering, so the units at risk are the unsold part of one 3,000-unit order: on average about 1,500 units at $7.65, a write-down near $5,500 on the same assumptions. The bigger order roughly doubles what a slowdown can cost.

What the minimum does to the bank balance

On 30/70 terms the money leaves in steps, and all of it leaves before a unit sells. Production times and transit are assumptions here: seven weeks to make, four on the water and through customs.

WhenQuote AQuote B
Week 0, purchase order: 30% deposit$5,400$16,200
Week 7, before loading: 70% balance$12,600$37,800
Week 11, arrival: duty$3,600$10,800
Week 11, freight to the 3PL$1,350$4,500
Out before the first sale$22,950$69,300

Then the stock sells down. At 800 units a month, quote A's 3,000 units last under four months and quote B's 10,000 about twelve and a half. That is how long the stock lasts, not when the cash is back: cash returns as each sale's payout after fees, shipping, ads and refunds, on each channel's payment dates, so cash payback is a separate date (one hoodie from factory deposit to payout works it through to the bank). The supplier's terms end at week 7. After that, quote B's cash comes back a sale at a time over the following year, while quote A's is back within a few months.

In the accounts, the deposit is an advance to the supplier, held as an asset, not an expense. When ownership passes under the shipping terms the order becomes inventory, with duty and inbound freight added to its cost. Each unit's landed cost moves to cost of goods sold when its sale is recorded, and storage and shipping to customers are monthly costs, not part of what the stock cost (3PL costs).

Before committing, put the dated payments for quote B into a 13-week cash flow forecast beside every other order, payroll and ad budget due in the same weeks. The question is whether the company can pay $37,800 in week 7 and $15,300 in week 11 without missing something else, and what the cash would have done otherwise. More working capital in stock lengthens the cash conversion cycle for every product, not only this one.

How to lower an MOQ or the cash it ties up

Each of these trades something for a smaller minimum or a later payment. Run the same four numbers on each before asking.

Ask for terms instead of a lower minimum

If the factory will not move the minimum, ask it to move the money. On quote B, 30/70 means all $54,000 leaves before the goods ship. The same order on net 60 from arrival would push that out by three to four months, past the first months of sales. Many factories refuse terms to a new buyer and some ask a slightly higher price for them; price the terms as a rate against your credit line, since they are often cheaper than borrowing the same money.

Share materials across products

Where the minimum comes from a material, spread that material across more than one product. The same powder-coat color on the tumbler and a matching water bottle can meet the powder batch across both; one printed box with a color sticker can serve every color instead of a box per color. The finished-goods line still has its own minimum per product, so this lowers the material minimum and leaves the line minimum where it was.

Launch fewer colors

At a per-color minimum, colors multiply the order. Four colors at 3,000 is $91,800 at quote A's landed cost; two colors is $45,900. One or two colors at full depth, with more added on a reorder once sales show which sell, commits half the cash to the test.

Pay a surcharge for a short run

Below the minimum, a factory may quote a surcharge instead of a refusal. To test a new color, the company asks for 1,500 units and is quoted $0.60 more per unit, $6.60 at the factory:

3,000 at the minimum1,500 with a surcharge
Landed cost per unit$7.65$8.37
Order at landed cost$22,950$12,555
Months of sales at 300 a month105

The surcharge costs $0.72 a unit landed, about $1,080 on the run. It keeps about $10,400 out of stock and halves the months the test color sits. If the color sells, the reorder goes at the minimum price; if it does not, the company is holding 1,500 units instead of 3,000. The surcharge is part of what the units cost, so it goes into their landed cost rather than an expense line.

Ask for staged deliveries

Some factories will make the full run at the larger quantity's price and ship it in parts: here, two shipments of 5,000, each balance due before that half ships. That cuts the average stock on hand under quote B from $34,650 to about $17,325 and the cash out before the first sale from $69,300 to about $42,750, though the deposit on the second half stays with the factory for months. The factory's $5.40 was quoted for one shipment, though, and a price that comes back at $5.55 for two cuts the saving by a quarter, to about $5,400. Others will want the full balance before they store finished goods, or will charge for the space. If the factory holds units you have paid for, whether they count as your inventory depends on when ownership and the risk of loss pass to you and whether those units are set aside as yours; until then the payment stays a deposit.

Commit to annual volume

A factory may give the 10,000-unit price on four calls of 2,500 across the year. The cash on the shelf then looks like a smaller order with the bigger order's price. Conditions a factory may attach are a deposit against the year's volume and a clause billing back the price difference if fewer units are taken. If it becomes likely the company will take fewer units than committed, the expected bill-back is added to the cost of units already bought as soon as it becomes likely, not when the factory invoices it. If the commitment cannot be cancelled and the units would now sell for less than they cost, a loss may need to be recorded before the goods arrive. Read the clause before signing and ask your CPA how it would be treated.

Get a second supplier

A live quote from another factory, or another country, changes the conversation about minimums even when the order stays put, as long as moving it is realistic; supply chain resilience covers the case for a second source.

When the factory says no

Any of these asks can get a no. A factory near capacity has little reason to break a run for a small buyer, and one whose own material supplier sets the minimum may not be able to move it. Ask what would change the answer: a larger order next time, a stock color, more clean orders. Then decide with the arithmetic: take the minimum, take the bigger order knowing how many months it covers, or find a supplier whose minimum fits.

Low MOQ suppliers: where the setup cost goes

A supplier that offers a low minimum on a custom product still has setup costs to recover. Ask where they went: into a higher unit price, a separate setup or mold charge, or a stock blank with your logo added instead of a product made to your specification. Price it with the same four numbers: a higher landed cost per unit against less cash out, fewer months of stock and a smaller write-down if it does not sell.

Back to the 10,000-unit quote

At today's pace, the lower unit price comes out about $1,400 ahead in a year, for about $46,000 more cash out, nearly nine months of extra stock and a write-down that roughly doubles if sales slow. The same saving with staged deliveries, an annual commitment or later terms would be worth far more, if the factory agrees. Count the extra units in months of sales first; the cents off the unit price come second.

FAQ

Is a minimum order quantity negotiable?

Often, within limits set by the factory's own costs. A minimum driven by a material lot, such as a dye batch or a print run, moves when the material decision changes: a stock color, a shared component, fewer colors. A minimum driven by a production line can sometimes be met with a surcharge or staged deliveries. A factory near capacity, or one bound by its own supplier's minimum, may refuse.

What MOQ should a first order for a new product use?

The smallest the factory will make at a landed cost that still leaves an acceptable margin. A new product has no sales history, so the months of sales an order represents are a guess, and the write-down risk is highest. Paying a surcharge for a short run, or launching one or two colors, can cost less than holding a full minimum of a product that does not sell.

Can a supplier raise its MOQ on a reorder?

Yes. A minimum on one quote is not a commitment for the next, and minimums and prices can rise between orders, for example when the factory's material costs or its own suppliers' minimums change. To limit that, ask for the minimum, unit price and terms to be fixed in writing for a set period or number of orders, and keep a second quote current.

See the whole platform

Reading it is one thing. Running it is another.

Book a demo for an overview of the whole platform.

Margin Matters

The ecommerce news, read for your margin

Twice a month: the changes that touch your P&L, the money behind each one, and one move to make. Three minutes, then back to work.

Twice a month. Unsubscribe anytime.